Hall bath

Down to the studs

A hall bath stripped to the framing: rotten subfloor out, new insulation in the exterior wall, a new tub set and levelled, and new board up ready for tile.

Scope
Full gut hall bath
Rooms
Hall bath
Timeline
add timeline
Year
add year

Still on the tools. These are the build photos. The finished room hasn't been photographed yet — when it is, this page gets a proper hero and a before-and-after.

New alcove tub set and levelled into a freshly insulated wall

What we ran into

Taking a bath back to the studs is not always the plan going in, but once the surround was off the framing it was the obvious call here — the exterior wall had almost no insulation left in it, and the subfloor around the old tub had been wet long enough to stain through.

So it all came out: tub, board, wiring for the old fixture, and what was left of the insulation. New batts went into the exterior bay, the tub was set and levelled before anything closed up around it, and the walls went back with new board and a fresh vent.

Stripped back to bare wall
Stripped back to bare wall
Down to the framing — old plumbing exposed
Down to the framing — old plumbing exposed
New batts in the exterior wall
New batts in the exterior wall
Board up, ready for tile
Board up, ready for tile
Add a client quote for this project — one or two sentences, in their words.
Client name — neighborhood
Materials
New wall insulation Alcove tub Cement board New vent Matte black fixtures