← Back to projects
Decks

Two decks

One rebuild from the footings up on a deck that had gone soft, and one composite deck with an aluminium rail. Both built to sit level through a Utah winter.

Scope
Deck rebuild + new build
Rooms
Two houses
Timeline
add timeline
Year
add year
New composite deck with wood railing and steps down to the lawn

Taking one down to the dirt

The first deck had reached the age where the boards flex underfoot and the steps have gone soft at the nose. You can face-screw new boards onto a frame like that and it will look fine for a season, but the problem is underneath.

So it came out entirely, down to the dirt. New footings, laid out and set before anything went back on top. That's the part of a deck job nobody sees and the part that decides whether it's still flat in ten years.

It went back as composite — no annual stain, no splinters, and it holds its colour through a Utah winter and the freeze-thaw that follows. Steps down to the lawn on the same line as the old ones, so the path in the grass still made sense.

Before — the old deck
Before — the old deck
Down to the dirt, new footings set
Down to the dirt, new footings set
New boards and steps going on
New boards and steps going on

Before & after

Before — The deck
Before · The deck
After — The deck
After · The deck

A second deck, another house

Different job, same idea — composite boards with a black aluminium rail, which stays put and never needs painting.

Composite deck with a black aluminium railing
Composite deck with a black aluminium railing
The steps and rail from the lawn
The steps and rail from the lawn
Add a client quote for this project — one or two sentences, in their words.
Client name — neighborhood
Materials
Composite decking New concrete footings Aluminium railing Wood railing Framed steps

Thinking about a deck?

I'll come look, measure, and leave you a written scope. Free, and no pressure after.

All projects Next project: Waterproofed right →